chevron_left chevron_right
Resources Center, Temporary Labour Camp
Construction

Resources Center, Temporary Labour Camp
China State Consruction Engineering Corporation LLC

Resources Center, Temporary Labour Camp - image 1
Resources Center, Temporary Labour Camp - image 2

Project Overview

This project was an execution of over 27,000 Sqm. of high quality labour camp with 60 min fire rated specifications that serves as a testimony of Extra Co's ability as a business unit and group to handle mega scale project executions with utmost planning and stakeholder satisfaction. The project serves as a case study internally for executing all large scale projects drawing on the rich experience of managing design, engineering, production layout, QA/QC, logistics and storage, product improvement and critical installation at site.

LET'S WORK TOGETHER

READY TO BUILD
THE FUTURE?

Contact us for your upcoming project.

engineering

AI Assistant

Online
smart_toy
Hello! I'm your Extra Co AI assistant. How can I help you with our solutions today?

Powered by Extra Co AI

settings_accessibility Accessibility Tools

format_size Text Size